Question 1
The structural analysis for a sector-frame replacement omits an existing microwave dish that remains on the tower. The replacement frame is lighter than the frame being removed. Before accepting the analysis as applicable to the work, the lead technician should:
Show answer & explanation
Correct answer: D - Obtain a structural disposition that accounts for the actual installed inventory.